• Solution Treated Investment Cast Metal Valve
  • Solution Treated Investment Cast Metal Valve
  • Solution Treated Investment Cast Metal Valve
  • Solution Treated Investment Cast Metal Valve
  • Solution Treated Investment Cast Metal Valve
  • Solution Treated Investment Cast Metal Valve

Solution Treated Investment Cast Metal Valve

Casting Method: pressure Crystallization
Process: Lost Wax Casting
Molding Technics: Pressure Casting
Application: Machinery Parts
Material: Stainless Steel
Surface Preparation: Sand Blast
Samples:
US$ 100/Piece 1 Piece(Min.Order)
| Request Sample
Customization:
Diamond Member Since 2023

Suppliers with verified business licenses

Manufacturer/Factory, Trading Company
  • Overview
  • Product Description
  • Detailed Photos
  • Company Profile
  • Packaging & Shipping
  • Certifications
  • FAQ
Overview

Basic Info.

Model NO.
JZ-0008
Surface Roughness
Ra1.6
Machining Tolerance
+/-0.02mm
Standard
ASTM
Certification
ISO 9001:2000, ISO 9001:2008, SGS
Machining Facility
Mct+CNC
NDT
Mt/Ut/PT
Heat Treatment
Normalizing / Qt / Solution Treatment
Surface Treatment
Electrophoretic Paint
Transport Package
Plastic Bag+Carton+Pallet
Specification
1000mm*1000mm*500mm
Trademark
Changjin
Origin
China
Production Capacity
1000t

Product Description

Product Description

  Product Description
Material Stainless steel SS316L, SS304,SS316
Mould features Advanced design,  Logical structure,  High precision,  Qualified materials, Long lifetime, Short delivery time.
Standard ASTM, JIS, BSW, ANSI, GB, DIN
Certificate ISO9001,ISO14001,ISO45001,SGS
Tolerance >0-6:±0.1;>6-30:±0.2;>30-120:±0.3;>120:±0.5
Dimension As per customers' request

Processing Step1: Die Casting/sand casting/gravity casting
Step2: CNC turning, CNC turning and milling compound processing, 3/4/5 axis CNC milling, drilling, wire-cutting, EDM, grinding etc.
Step3: Surface treatment
Surface Anodize, Plating, Brushing, Polishing, Blackened, Powder coating, Sandblasting, Laser engraving, ED- Coating, Chromate Plating, Zinc Plating, Dacromat Coating, etc.
Marking laser marking,Air marking
Inspection material, dimension, heat treatment, hardness, NDT, surface
Quality ISO9001, PPAP control production
Lead time as per clients' requirements
Delivery Express for sample, ocean shipping/air for mass production
Our Capabilities CNC machining, CNC center machining, drilling, milling, turning, grinding, tapping, die casting, casting, forging, stamping

Engineering&manufacturing services R&D process, tooling and gauging design, product design
Integrated CAD/CAM system, test and measuring
 
Packing Eco-friendly pp bag / EPE Foam /Carton boxes or wooden boxes 
As customer's specific requirements

Detailed Photos

PRODUCTS SHOW

Solution Treated Investment Cast Metal ValveSolution Treated Investment Cast Metal Valve

OUR WORKSHOP
Solution Treated Investment Cast Metal Valve
CASTING EQUIPMENT
Solution Treated Investment Cast Metal Valve

FORGING EQUIPMENT
Solution Treated Investment Cast Metal Valve

MACHINING EQUIPMENT
Solution Treated Investment Cast Metal Valve
INSPECTION
Solution Treated Investment Cast Metal Valve
Company Profile

Qingdao Xinchangjin Machinery Co., Ltd., established in 2008, has carved a niche in the machinery manufacturing domain. Specializing in Crane Hoist Parts, valve accessories, reducers, and other mechanical products, we are a modern enterprise integrating R&D, manufacturing, foreign trade, marketing, and multifaceted services. Supported by cutting-edge technology, driven by uncompromising quality, and rooted in innovation, we aspire to provide not only top-tier machinery products but also comprehensive services from casting and forging non-ferrous metal raw materials to fabricating finished parts. Our integrated machining solutions ensure we meet the diverse needs of our clients, making us their trusted partner.
Solution Treated Investment Cast Metal Valve

Packaging & Shipping

We meticulously design suitable packaging for each part during sample development, considering the part structure, quantity per lot, and customer requirements. This ensures optimal protection and efficient logistics.
Solution Treated Investment Cast Metal Valve
Certifications

Solution Treated Investment Cast Metal Valve
Solution Treated Investment Cast Metal Valve
Solution Treated Investment Cast Metal Valve

Our relentless focus on quality and performance, alongside our user-centric approach, has propelled us to new heights. We have attained ISO9001:2015 for quality, ISO 14001:2015 for environmental management, and ISO 45001:2018 for occupational health and safety management systems.

Solution Treated Investment Cast Metal Valve
Solution Treated Investment Cast Metal Valve
Solution Treated Investment Cast Metal Valve

FAQ

Q: Are you a factory or trading company?
A: We are a factory.

Q: What do I need for offering a quote?
A: Please provide detailed drawings (PDF/STEP/IGS/DWG…) along with material specifications, quantity, and surface treatment information.

Q: How about the MOQ?
A: The MOQ varies based on your specific needs. We also welcome trial orders before mass production.

Q: Can I get a quote without drawings?
A: Yes, we can provide a quotation based on your samples, pictures, or drafts with detailed dimensions.

Q: How long can I have the sample?
A: The time required for samples depends on your product specifications and requests. Typically, it takes between 7 to 20 days.

Q: Will my drawings be divulged if you benefit?
A: We prioritize our customers' confidentiality. Your drawings will remain secure, and we can sign a Non-Disclosure Agreement (NDA) if necessary.

Q: Is it possible to know how my product is progressing without visiting your company?
A: Absolutely. We provide a detailed product schedule and send weekly reports, including pictures and videos, to keep you updated.

Q: How do you control the quality?
A: Our quality control process includes: 1. Material inspection: Checking the material surface and basic dimensions.
2. Production first inspection: Ensuring critical dimensions during mass production.
3. Sampling inspection: Verifying quality before transferring to the warehouse.
4. Final inspection: Conducting a 100% inspection before shipment.

Q: What will you do if we receive defective parts?
A: Please send us photos of the defective parts. Our engineers will promptly investigate and provide solutions, including remaking the parts as soon as possible.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2023

Suppliers with verified business licenses

Manufacturer/Factory, Trading Company
Registered Capital
50000000 RMB
Plant Area
13400 square meters