Type: | Chemical Hardening Sand |
---|---|
Casting Method: | pressure Crystallization |
Application: | Machinery Parts |
Material: | Cast Iron Gc20/FC20/Gcd450/Fcd450 |
Surface Roughness: | Ra1.6 |
Standard: | ASTM |
Samples: |
---|
Customization: |
---|
Suppliers with verified business licenses
CASTING EQUIPMENT
We prioritize quality and performance, always placing our users at the forefront. In management, we've reached new milestones by adopting ISO 9001:2015 for international quality, ISO 14001:2015 for environmental standards, and ISO 45001:2018 for occupational health and safety management systems.
Q: Are you a factory or trading company?
A: We are a factory.
Q: What do I need for offering a quote?
A: You need to provide detailed drawings (PDF/STEP/IGS/DWG...) with material specifications, quantity, and surface treatment information.
Q: How about the MOQ?
A: The Minimum Order Quantity depends on your specific needs. We also welcome trial orders before mass production to ensure your satisfaction.
Q: Can I get a quote without drawings?
A: Absolutely, we can provide a quote based on your samples, pictures, or sketches with detailed dimensions.
Q: How long can I have the sample?
A: The time required to prepare a sample depends on your product and specific requests. Typically, it takes 7-20 days.
Q: Will my drawings be divulged if you benefit?
A: No, we are committed to protecting our customers' privacy. We can also sign a Non-Disclosure Agreement (NDA) if necessary to ensure confidentiality.
Q: Is it possible to know how my product is progressing without visiting your company?
A: Yes, we provide a detailed product schedule and send weekly progress reports, complete with pictures and videos.
Q: How do you control the quality?
A: We implement rigorous quality control measures: material inspection to check surface and dimensions, production first inspection to ensure critical dimensions in mass production, sampling inspection before warehousing, and final inspection at 100% before shipment.
Production first inspection--Ensuring critical dimensions in mass production.
Sampling inspection--Checking quality before sending to the warehouse.
Final inspection--100% inspection before shipment.
Q: What will you do if we receive defective parts?
A: Please send us pictures of the defective parts. Our engineers will analyze the issue and promptly find solutions. We will remake the parts for you as soon as possible.
Suppliers with verified business licenses