Industrial Premium Heat Treated Lost Wax Pump Valve

Product Details
Customization: Available
Casting Method: pressure Crystallization
Process: Lost Wax Casting
Still deciding? Get samples of $ !
Request Sample
Diamond Member Since 2023

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Registered Capital
50000000 RMB
Plant Area
13400 square meters
  • Industrial Premium Heat Treated Lost Wax Pump Valve
  • Industrial Premium Heat Treated Lost Wax Pump Valve
  • Industrial Premium Heat Treated Lost Wax Pump Valve
  • Industrial Premium Heat Treated Lost Wax Pump Valve
  • Industrial Premium Heat Treated Lost Wax Pump Valve
  • Industrial Premium Heat Treated Lost Wax Pump Valve
Find Similar Products
  • Overview
  • Product Description
  • Detailed Photos
  • Company Profile
  • Packaging & Shipping
  • Certifications
  • FAQ
Overview

Basic Info.

Model NO.
JZ-0008
Molding Technics
Pressure Casting
Application
Machinery Parts
Material
Stainless Steel
Surface Preparation
Sand Blast
Surface Roughness
Ra1.6
Machining Tolerance
+/-0.02mm
Standard
ASTM
Certification
ISO 9001:2000, ISO 9001:2008, SGS
Machining Facility
Mct+CNC
NDT
Mt/Ut/PT
Heat Treatment
Normalizing / Qt / Solution Treatment
Surface Treatment
Electrophoretic Paint
Transport Package
Plastic Bag+Carton+Pallet
Specification
1000mm*1000mm*500mm
Trademark
Changjin
Origin
China
Production Capacity
1000t

Product Description

Product Description

  Product Description
Material Stainless steel SS316L, SS304,SS316
Mould features Advanced design,  Logical structure,  High precision,  Qualified materials, Long lifetime, Short delivery time.
Standard ASTM, JIS, BSW, ANSI, GB, DIN
Certificate ISO9001,ISO14001,ISO45001,SGS
Tolerance >0-6:±0.1;>6-30:±0.2;>30-120:±0.3;>120:±0.5
Dimension As per customers' request

Processing Step1: Die Casting/sand casting/gravity casting
Step2: CNC turning, CNC turning and milling compound processing, 3/4/5 axis CNC milling, drilling, wire-cutting, EDM, grinding etc.
Step3: Surface treatment
Surface Anodize, Plating, Brushing, Polishing, Blackened, Powder coating, Sandblasting, Laser engraving, ED- Coating, Chromate Plating, Zinc Plating, Dacromat Coating, etc.
Marking laser marking,Air marking
Inspection material, dimension, heat treatment, hardness, NDT, surface
Quality ISO9001, PPAP control production
Lead time as per clients' requirements
Delivery Express for sample, ocean shipping/air for mass production
Our Capabilities CNC machining, CNC center machining, drilling, milling, turning, grinding, tapping, die casting, casting, forging, stamping

Engineering&manufacturing services R&D process, tooling and gauging design, product design
Integrated CAD/CAM system, test and measuring
 
Packing Eco-friendly pp bag / EPE Foam /Carton boxes or wooden boxes 
As customer's specific requirements

Detailed Photos

PRODUCTS SHOW

Industrial Premium Heat Treated Lost Wax Pump ValveIndustrial Premium Heat Treated Lost Wax Pump Valve

OUR WORK SHOP
Industrial Premium Heat Treated Lost Wax Pump Valve
CASTING EQUIPMENT
Industrial Premium Heat Treated Lost Wax Pump Valve

FORGING EQUIPMENT
Industrial Premium Heat Treated Lost Wax Pump Valve

MACHINING EQUIPMENT
Industrial Premium Heat Treated Lost Wax Pump Valve
INSPECTION
Industrial Premium Heat Treated Lost Wax Pump Valve
Company Profile

Qingdao Xinchangjin Machinery Co., Ltd., founded in 2008, excels in machinery manufacturing. Specializing in Crane Hoist Part, valve accessories, reducers, and other mechanical products, it is a cutting-edge enterprise that integrates R&D, manufacturing, foreign trade, and marketing services. Leveraging high technology and prioritizing superior quality and innovation, the company is dedicated to delivering top-notch machinery products alongside comprehensive services. From casting and forging non-ferrous metal raw materials to fabricating finished parts and components and offering integrated machining solutions, Qingdao Xinchangjin ensures excellence at every step.
Industrial Premium Heat Treated Lost Wax Pump Valve

Packaging & Shipping

We meticulously design the most suitable packaging for each part during sample development, considering the part structure, quantity per lot, and specific customer requirements.
Industrial Premium Heat Treated Lost Wax Pump Valve
Certifications

Industrial Premium Heat Treated Lost Wax Pump Valve
Industrial Premium Heat Treated Lost Wax Pump Valve
Industrial Premium Heat Treated Lost Wax Pump Valve

Our commitment to quality and performance is unwavering. We have elevated our management standards by adopting the ISO9001: 2015 international quality standard, ISO 14001: 2015 environmental standard, and ISO 45001: 2018 occupational health and safety management system, thereby ensuring top-tier quality and compliance.

Industrial Premium Heat Treated Lost Wax Pump Valve
Industrial Premium Heat Treated Lost Wax Pump Valve
Industrial Premium Heat Treated Lost Wax Pump Valve

FAQ

Q: Are you a factory or trading company?
A: We are a factory.

Q: What information is required to get a quote?
A: Please provide detailed drawings (PDF/STEP/IGS/DWG...) along with material specifications, quantities, and surface treatment details.

Q: What is the minimum order quantity (MOQ)?
A: The MOQ is based on your specific needs. We also welcome trial orders before mass production.

Q: Can you provide a quote without drawings?
A: Yes, we can offer a quote based on your samples, pictures, or drafts with detailed dimensions.

Q: How long does it take to receive a sample?
A: The time frame depends on your product and request, typically ranging from 7 to 20 days.

Q: Will my drawings be kept confidential?
A: Absolutely. We take customer privacy very seriously. We can also sign an NDA if required.

Q: Can I monitor my product's progress without visiting the factory?
A: Yes, we provide a detailed production schedule and send weekly reports complete with pictures and videos.

Q: How do you ensure product quality?
A: Our quality control process includes material inspection, initial production inspection, sampling inspection, and final inspection. Each step ensures that we meet the highest quality standards.
Production first inspection--Ensures critical dimensions are met during mass production.
Sampling inspection--Checks quality before products are sent to the warehouse.
Final inspection--Every product undergoes a 100% inspection before shipment.

Q: What if we receive defective parts?
A: Please send us pictures of the defects. Our engineers will promptly assess the issue and provide a solution, including remaking the parts if necessary.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier