Customization: | Available |
---|---|
Type: | Chemical Hardening Sand |
Casting Method: | pressure Crystallization |
Still deciding? Get samples of US$ 200/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Material | Carbon steel, stainless steel, alloy steel, gray cast iron, ductile cast iron |
Mould features | Advanced design, Logical structure, High precision, Qualified materials, Long lifetime, Short delivery time. |
Standard | ASTM, JIS, BSW, ANSI, GB, DIN |
Certificate | ISO 9001: 2015 , ISO 14001: 2015 , ISO 45001: 2018, SGS |
Tolerance | >0-6:±0.1; >6-30:±0.2; >30-120:±0.3; >120:±0.5 |
Dimension | As per customers' request |
Processing | Step1: Die Casting/sand casting/gravity casting Step2: CNC turning, CNC turning and milling compound processing, 3/4/5 axis CNC milling, drilling, wire-cutting, EDM, grinding etc. Step3: Surface treatment |
Surface | Anodize, Plating, Brushing, Polishing, Blackened, Powder coating, Sandblasting, Laser engraving, ED- Coating, Chromate Plating, Zinc Plating, Dacromat Coating, etc. |
Marking | Laser marking,Air marking |
Inspection | Material, Dimension, Heat treatment,Hardness, NDT, Surface |
Quality | ISO 9001, PPAP, Control Production |
Lead time | as per clients' requirements |
Delivery | Express for sample, ocean shipping/air for mass production |
Our Capabilities | CNC machining, CNC center machining, drilling, milling, turning, grinding, tapping, die casting, casting, forging, stamping |
Engineering & manufacturing services | R&D process, tooling and gauging design, product design Integrated CAD/CAM system, test and measuring |
Packing | Eco-friendly pp bag / EPE Foam /Carton boxes or wooden boxes As customer's specific requirements |
CASTING EQUIPMENT
Quality and performance are our priorities. We have achieved new management standards by adopting ISO 9001:2015 for quality, ISO 14001:2015 for the environment, and ISO 45001:2018 for occupational health and safety management systems.
Q:Are you a factory or trading company?
A: We are a factory.
Q:What do I need for offering a quote?
A: Detailed drawings (PDF/STEP/IGS/DWG...) including material specifications, quantity, and surface treatment information.
Q:How about the MOQ?
A: The MOQ depends on your requirements. We also welcome trial orders before mass production.
Q:Can I get a quote without drawings?
A: Yes, we can provide a quotation based on your samples, pictures, or drafts with detailed dimensions.
Q:How long can I have the sample?
A: The sample preparation time usually ranges from 7 to 20 days, depending on your product and request.
Q:Will my drawings be divulged if you benefit?
A: No, we prioritize our customers' privacy. We are open to signing an NDA if required.
Q:Is it possible to know how my product is progressing without visiting your company?
A: We provide a detailed product schedule and send weekly reports complete with pictures and videos.
Q: How do you control the quality?
A: We perform material inspections to check surface and dimensions, initial production inspections for critical dimensions, sampling inspections before warehousing, and final inspections before shipment.
Production first inspection--To ensure the critical dimension in mass production.
Sampling inspection--Check the quality before sending to the warehouse.
Final inspection--100% inspected before shipment.
Q: What will you do if we receive defective parts?
A: Please send us pictures of the defective parts. Our engineers will analyze the issue and promptly remake the parts for you.