Customization: | Available |
---|---|
Certification: | ISO, SGS |
Surface Treatment: | Nickel Plating |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
CASTING EQUIPMENT
We have always prioritized quality and performance, ensuring user satisfaction. Our management systems are certified at the highest standards, including ISO9001: 2015 for quality, ISO 14001: 2015 for environmental management, and ISO 45001: 2018 for occupational health and safety.
Q: Are you a factory or trading company?
A: We are a factory.
Q: What information is required to receive a quote?
A: We need detailed drawings (PDF/STEP/IGS/DWG) that include material specifics, quantity, and surface treatment information.
Q: What is the MOQ?
A: The MOQ depends on your specific needs. We also welcome trial orders before commencing mass production.
Q: Can I receive a quote without providing drawings?
A: Absolutely! We can provide an accurate quotation based on your samples, pictures, or drafts with detailed dimensions.
Q: How long will it take to receive the sample?
A: The timeline varies based on product specifics and your requests, generally ranging from 7 to 20 days.
Q: Will my drawings be kept confidential?
A: Absolutely. We are committed to protecting our customers' privacy. If needed, we can sign an NDA to ensure confidentiality.
Q: Is it possible to track my product's progress without visiting your company?
A: Certainly, we provide detailed product schedules along with weekly reports, including pictures and videos.
Q: How do you ensure quality control?
A: Our quality control process includes material inspection to check surface and dimensions.
Production first inspection to verify critical dimensions during mass production.
Sampling inspection to check quality before sending items to the warehouse.
Final inspection where 100% of the products are inspected before shipment.
Q: What should I do if I receive defective parts?
A: Please send us photos of the defective parts, and our engineers will promptly work on solutions and remanufacture the parts as soon as possible.